Schemas
MinutesQuota
The video you analysed in the current period. Each finished analysis counts its video's length, rounded up to a whole second, on the day (UTC) it finished. A failed or cancelled analysis counts nothing, and deleting an analysis does not give its seconds back.
| Field | Description |
|---|---|
usedSeconds integer (int64), required | The seconds of video analysed in this period. |
limitSeconds integer (int64), optional | The seconds of video your plan includes per period. Absent when there is no limit.
Starting an analysis is refused (QUOTA_EXCEEDED, field minutes) when none are left.
An analysis whose video is longer than what is left ends FAILED with the message "The
video is longer than the minutes left in this period." as soon as its length is known,
and counts nothing, so finished analyses never take usedSeconds above the limit; it is
above it only when your limit was lowered or newly set during the period. Analyses still
QUEUED or PROCESSING already hold their videos' lengths of what is left, rounded up to
whole seconds, though usedSeconds counts them only once they finish.
|